Flatbed Shipping in Florida: What Actually Needs an Open Deck

Some freight simply will not go through a trailer door. Flatbed and open-deck equipment exists for loads that must be crane- or forklift-loaded from the side or top, or that exceed the internal dimensions of a dry van.

Typical flatbed freight

If any of these describe your load, plan on open deck.

  • Construction materials: lumber, steel, rebar, pipe, precast concrete
  • Roofing, drywall, and bundled building products loaded by forklift
  • Machinery, generators, HVAC units, and equipment on skids
  • Loads that exceed dry van door height, width, or length
  • Anything requiring crane or overhead loading

Securement and weather protection

Open-deck freight is secured with straps, chains, binders, edge protection, and dunnage chosen for the commodity, and it is inspected during transit. Loads that cannot take weather are tarped — tell the carrier up front, because tarping affects labor, time, and equipment selection.

Oversize and overweight loads

Once a load exceeds legal dimensions or weight, it enters permitted territory. Permits are issued per jurisdiction and may come with travel-time restrictions, route limitations, escort requirements, and signage or flag rules.

Permitted moves need lead time. Give the carrier exact dimensions and weight early — an estimate that turns out low can stop a load at a scale.

What to send when you request a flatbed quote

Exact length, width, and height of the load as it sits, total weight, how it will be loaded and unloaded, whether tarping is required, and whether either site has overhead or ground clearance constraints.

Common Questions

Do I need a permit for my flatbed load?

Only if the load exceeds legal dimension or weight limits. Provide exact measurements and the carrier will confirm whether permits, routing restrictions, or escorts apply.

Can flatbed freight be protected from rain?

Yes, with tarping. Request it when you book, since it changes the labor and equipment required for the load.